Permit Information
Permit NumberFIR16-00553
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51
Customer Number 
ePlanReviewYes
Description
[Micron Building 51]
The fire sprinkler scope of work consists of part of the subfloor area. The system is designed as a grid with a loop feed main. The grid has a 4” primary and secondary mains with 1 ½” branch lines. The sprinklers are center in the intersections of the waffle ceiling. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-01184] - Permit to construct the steel super structure to a new 168,000 square foot R & D Facility. This permit scope of work was only for the structural steel construction. No details of the exterior coverings / insulation / Interior Exit stairs / etc. were provided as part of this permit. Current alternates are submitted; however, assurances were given that this project will proceed regardless of the approval of the alternates. Foundation permit issued under BLD16-01184. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20197/25/20197/25/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Please call Clarence at ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection4/12/20194/12/20194/12/2019PCANC
DetailsJim Page
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.

Clarence Phone #: ###-####
INSP-Final Inspection6/30/20176/30/20176/30/2017PPART
DetailsJim Page
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
INSP-Sprinkler Rough-in/Hydro6/8/20176/9/20176/9/2017APASS
DetailsJim Page
Hydrostatic test for systems 10-2 and 10-6 complete.
INSP-Sprinkler Rough-in/Hydro6/8/20176/8/20176/8/2017PCANC
DetailsJim Page
Hydrostatic test cancelled by contractor, Chris ###-####