Description |
[Boise Fire Station #8]
The fire sprinkler scope of work consists of protecting a two level fire station per NFPA 13. The system has a 4” backflow preventer with 4” header and 4” floor control valves.
As Built 1/20/2017
Rerouted main(s) on second floor. New hydraulic calculations were provided.
Change sprinklers to upright in stairway on second level.
Rerouted main(s) on the first floor
The underground is under permit FIR16-00477
[BLD16-01092] - Permit to construct a new 11,936 square foot fire station. This building is fire sprinklered for area increase and non-separated uses. This building utilizes enhanced lighting to comply with the 2012 IECC. Scope of work includes: construction of poured concrete foundation, construction of reinforced CMU exterior walls, construction of new steel bar-joist floor – ceiling framing / steel pan deck, [construction of interior nonbearing walls to create: 7 sleeping units, 5 restrooms / bathing rooms, lobby, three offices, work room, turn out room, decon room, maintenance shop, riser room, 3 storage rooms, laundry room, janitors closet, fitness room, kitchen, and dayroom], new elevator, new electrical, new plumbing, new mechanical, new interior / exterior finishes, new accessible doors / hardware, and related site work. This building is fully fire sprinklered for area increase. **TLW**
|