Permit Information
Permit NumberFIR16-00606
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 2972 E PARKCENTER BLVD
Project NameArboretum at Barber Station #2
Customer Number 
ePlanReviewYes
Description
[Arboretum at Barber Station Building #2]
The fire sprinkler scope of work consists of Building #2 only. The five level building is protected per NFPA 13. The bottom level is a parking garage. The remaining levels are residential. The 6” underground will supply a 6” backflow preventer and 6” header. There is a dry system for the basement and a wet system for the remainder of the floors. There are two wet standpipes. One standpipe is being used as a combination riser for the floor control valves.

The underground piping is under permit FIR16-00473

• This building is NOT considered a high rise.
• This building is over 30’ and therefore, requires standpipes in all required stairwells.
• This building does use the special City of Boise ordinance and therefore NFPA 13 system is required.
• Exposed piping is steel. Concealed branch line piping on floors 2-5 is CPVC, the mains are steel.

[BLD16-01059] - (Building #2) Permit to construct a new 123,212 square foot (5) story apartment building. First floor foundation and concrete podium permit submitted under BLD15-04486. Each floor is approximately 24,405 square feet. Approval contingent upon adhering to the approved plans on file and attached engineering. This building is fully fire sprinklered with an NFPA 13 system to comply with special provisions of section 510.2 and area increase. Scope of work includes: interior finish of the first floor, construction of wood frame 4 story building on top of the previously approved podium, installation of interior non-bearing walls and bearing walls to create 80 individual units, new plumbing, new electrical, new mechanical, new insulation, new windows, new doors, and interior finishes in compliance with Chapter 8 of the 2012 IBC. This building will be sprinklered with a fully compliant NFPA 13 system to comply with special provisions of section 510.2 and area increase. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/4/201712/4/201712/4/2017APASS
DetailsJim Page
Final fire sprinkler inspection for building 2 passed/complete.
INSP-Final Inspection11/21/201711/28/201711/28/2017PFAIL
DetailsJim Page
1. Room 201 has exposed CPVC in water heater room. Head to close to ceiling fan.
2. Head in corridor between rooms 205 & 207 needs to be changed to an intermidate temperature, head is within 12 inches of heat register.
4. Room 213 has head to low in bathroom, same head is missing escutcheon.
5. Rooms 209, 214, 216, 220, 306, 309, and 504 has escutcheons missing.
8. Rooms 205, 219, 301, 414, 507, 516, and 519 has sprinkler heads to close to ceiling fans.
9. All exposed CPVC needs to be covered by sheetrock.
INSP-Sprinkler Rough-in/Hydro9/22/20179/22/20179/22/2017PPASS
DetailsJim Page
24 hour air test complete
INSP-Sprinkler Rough-in9/21/20179/21/20179/21/2017PPART
DetailsJim Page
24 hour air test started with 50psi at 2:00pm
INSP-Sprinkler Rough-in/Hydro8/28/20178/28/20178/28/2017PPART
DetailsJim Page
Hydrostatic test complete for parking level dry system, levels 2, 4 and 5 wet systems. Level 3 had a visable leak, leak was repaired, system will be rechecked on 29AUG2017
INSP-Sprinkler Rough-in/Hydro6/28/20176/29/20176/29/2017APART
DetailsJim Page
Hydrostatic test for wet standpipe complete
INSP-Sprinkler Rough-in6/21/20176/22/20176/22/2017APART
DetailsJim Page
Rough to cover inspectio for insulation above fire sprinkler piping complete, level 5 approved for cover.
INSP-Sprinkler Rough-in6/13/20176/13/20176/13/2017PPART
DetailsJim Page
Corrections have been made in rooms where too many heads were installed of off 1 inch pipe (see city approved drawings where rooms were noted with yellow highlighter and red ink indicating no cover) Rooms that were noted are approved for cover. North side of elevator lobby level 5 has been inspected, piping cannot be covered until an inspection has been performed to verify that there is a clear pocket between the sheetrock and overhead fire sprinkler piping/insulation for freeze prevention.
INSP-Supply line flush6/7/20176/9/20176/9/2017ACANC
DetailsJim Page
This inspection request cancelled, request is for underground flush and notes need to be entered under FIR16-00473
INSP-Sprinkler Rough-in6/8/20176/8/20176/8/2017PPART
DetailsJim Page
Partial rough to cover inspection complete, notated city approved drawings with yellow highlighter/red ink area's approved for cover, also have area's notated on city approved drawings with yellow highlighter/red ink rooms that are not approved for cover due to pipe install not matching city approved drawings (to many heads off of 1 inch pipe)
INSP-Supply line flush5/31/20176/1/20176/1/2017ACANC
DetailsJim Page
Cancelled per point of contact, Paul Phone #: ###-####, will be rescheduled.
INSP-Sprinkler Rough-in5/17/20175/17/20175/17/2017PPART
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping located east of the elevator lobby on level 2, all of level 2 approved for cover.
INSP-Sprinkler Rough-in4/24/20174/25/20174/25/2017APART
DetailsJim Page
Partial rough to cover inspection complete for overhead fire sprinkler piping on level 3, notated city approved drawings with green highlighter/red ink area's approved for cover.
INSP-Sprinkler Rough-in4/19/20174/20/20174/20/2017APART
DetailsJim Page
Partial rough to cover inspection complete for overhead fire sprinkler piping located on level 4, notated city approved drawings with pink highlighter/red ink area's approved for cover.
INSP-Sprinkler Rough-in4/12/20174/13/20174/13/2017APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping on level 2 complete, notated city approved drawings with green highlighter/red ink area's approved for cover on level 2. Partial rough to cover for overhead fire sprinkler piping/tenting on level 5 complete, notated city approved drawings with green highlighter/red ink area's approved for cover on level 5.
INSP-Sprinkler Rough-in4/5/20174/5/20174/5/2017PCANC
DetailsJim Page
Incorrect permit for inspection request, (Inspection request is for tenting associated with FIR16-00607, building 3 clubhouse) this request is cancelled and an inspection request will be generated for the correct permit number.
INSP-Sprinkler Rough-in/Hydro3/27/20173/27/20173/27/2017PFAIL
DetailsJim Page
Rough in inspection for level 2 corridor main complete. Rough to cover inspection performed on level 4, pipe scheduling did not match the city approved drawings, stopped inspection after finding 5 locations with too many heads off of 1 inch pipe. Pipe scheduling will need to be changed to coincide with city approve drawings, piping cannot be covered until repairs are made and a re-inspection is performed
INSP-Sprinkler Rough-in3/21/20173/23/20173/23/2017ACANC
DetailsJim Page
Called point of contact at phone number provided, Carlos Phone #: ###-#### three times to coordinate a meeting place, left a message on the first attempt, no return call recieved by 12:10pm, this request is cancelled, contractor will need to reschedule.
INSP-Sprinkler Rough-in3/14/20173/15/20173/15/2017PFAIL
DetailsJim Page
Approved plans that were provided were not the correct levels needing to be inspected, inspection request will need to reschedule when correct set of approved drawings can be provided.
INSP-Sprinkler Rough-in3/6/20173/6/20173/6/2017PPART
DetailsJim Page
Partial rough in inspection for overhead fire sprinkler piping located on level 5 complete, notated plans that were on site with yellow highlighter/red ink, area's that were inspected. Need to have a city approved set of drawings on site for next inspection. Piping in attic spaces cannot be covered until tenting is installed, inspected and passed, any piping that is covered before tenting inspection will have cover material removed to verify tenting installation.