INSP-Final Inspection | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
|
INSP-Final Inspection | 10/2/2017 | 10/3/2017 | 10/3/2017 | P | CANC |
Jim Page
|
|
|
Mike-high rise Phone #: ###-####
|
INSP-Final Inspection | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | PART |
Jim Page
|
|
|
Final fire alarm inspection passed/complete, fire alarm permit will remain in issued status until project is complete.
|
INSP-Final Inspection | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | CANC |
Jim Page
|
|
|
Mike Phone #: ###-####-high rise
|
INSP-Alarm Testing | 9/28/2017 | 9/29/2017 | 9/29/2017 | P | DONE |
Jim Page
|
|
|
Alarm testing complete for today.
|
INSP-Alarm Testing | 9/28/2017 | 9/29/2017 | 9/29/2017 | A | DONE |
Jim Page
|
|
|
Alarm testing complete for the day.
|
INSP-Alarm Testing | 9/27/2017 | 9/28/2017 | 9/28/2017 | P | DONE |
Jim Page
|
|
|
Alarm testing complete for the day.
|
INSP-Alarm Testing | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | DONE |
Jim Page
|
|
|
Fire alarm testing complete for today, audio/visual notification complete for level 1 to include parking, level 2 parking and level 3 corridor/rooms. Stairwell pressurization to include elevator shaft pressurization complete. Room notification complete for levels 3 and 10. Visual notification will be added to the 2 balconies off of the level 3 conference room on the northwest corner.
|
INSP-Alarm Testing | 9/26/2017 | 9/27/2017 | 9/27/2017 | P | DONE |
Jim Page
|
|
|
Alarm testing complete for today
|
INSP-Alarm Testing | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PART |
Jim Page
|
|
|
Fire alarm testing complete for audio visual notification on general alarm for levels 3, 4, 5, 6 and 10. Sounder bases for resident rooms on level 3 and 10 to be tested at a later date. Testing complete for valves tampers and fire pump monitoring. Dry system to be tested at a later date. Need to test stairwell pressurization on auto function as well as floor smoke control.
|
INSP-Final Inspection | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PART |
Jim Page
|
|
|
Final inspection complete for level 9, 8, and 7, remaining levels to be tested at a later date.
|
INSP-Alarm Testing | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | DONE |
Jim Page
|
|
|
Fire alarm testing complete for today.
|