INSP-Final Inspection | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide the two additional tamper switches for the backflow preventor and the test papers.
|
INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for inspection. Missing signage on riser door, missing sticker on bell, room is not one hour rated due to holes in the walls, missing canopy on sprinkler beneath stairs, project related undergrond permit has not been scheduled and the underground supply piping has not been flush yet. Need correct outlet to verify single sprinkler flow for testing the flow switch. Need backflow certified.
|
INSP-Sprinkler Rough-in/Hydro | 11/4/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 11/1/2016 | 11/2/2016 | 11/2/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed for the most part except ron stated that he is going to install 401 canopies on the second floor due to light fixture obstructions and the electrician is going to move the lights 3' away on the first floor. So another rough-in will be needed and another hydro test for the overhead system. Pipe sizing and hangers are ok.
|