INSP-Final Inspection | 4/25/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2017 | 8/10/2017 | 8/10/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping and tenting complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping complete.
|
INSP-Supply line flush | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | DONE |
Jim Page
|
|
|
Underground main supply flush complete.
|
INSP-Sprinkler Rough-in | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|