Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR16-00703
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 51 System 20-6
Customer Number 
ePlanReviewYes
Description
[Micron Building 51 System 20-6]
The fire sprinkler scope of work consists of providing protection for a small portion of the fab level 20.
The system is named LV20-6. The system is a tree design with 6” main and 1 ½” lines.
? FP1 Was reviewed for the riser detail only. The underground is under permit FIR16-00701
[BLD16-01184] - MICRON - Bldg 51 - Steel Super Structure Permit to construct the steel super
structure to a new 168,000 square foot R & D Facility. This permit scope of work was only for the
structural steel construction. No details of the exterior coverings / insulation / Interior Exit stairs / etc.
were provided as part of this permit. Current alternates are submitted; however, assurances were given
that this project will proceed regardless of the approval of the alternates. Foundation permit issued under
BLD16-01184. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20197/25/20197/25/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Please call Clarence ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Final Inspection4/12/20194/12/20194/12/2019PCANC
DetailsJim Page
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.

Clarence Phone #: ###-####
INSP-Final Inspection6/30/20176/30/20176/30/2017PPART
DetailsJim Page
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
INSP-Sprinkler Rough-in/Hydro6/14/20176/15/20176/15/2017APASS
DetailsJim Page
Rough to cover inspection complete for overhead fire sprinkler piping, approved for cover. Hydrostatic test complete for overhead fire sprinklers/piping associated with this system.