INSP-Final Inspection | 1/17/2017 | 1/18/2017 | 1/17/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/16/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Troy Cobbley
|
|
|
200 lb overhead hydro test passed
|
INSP-Final Inspection | 1/12/2017 | 1/13/2017 | 1/13/2017 | P | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet still need the 2 hour hydro test and reconnection to the main system. The 24 hour air test passed
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2017 | 1/12/2017 | 1/12/2017 | P | PART |
Troy Cobbley
|
|
|
Rough-in Inspection passed with the seismic brace added. Started the 24hr Air test at 2:00pm with 50 psi on the guage.
|
INSP-Sprinkler Rough-in | 1/6/2017 | 1/9/2017 | 1/9/2017 | A | PART |
Troy Cobbley
|
|
|
Plan modifications are needed showing the six additional 90's in the 4" main and the missing long. seismic bracing needs to be installed.
|