INSP-Final Inspection | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro tests passed.
|
INSP-Final Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | CANC |
Troy Cobbley
|
|
|
Call/ what fits best in your schedule // Robert Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | CANC |
Troy Cobbley
|
|
|
Colton Cox is the contact for this inspection. He is requesting and inspection in Building #1 and #2. His number is ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PART |
Troy Cobbley
|
|
|
Rough-in passed and tenting passed and piping can be covered except for the riser room ceiling where the tenting was not complete.
|