INSP-Final Inspection | 1/16/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in | 5/9/2017 | 5/10/2017 | 5/9/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground completed on 1/26/2017
|
INSP-Supply line flush | 4/18/2017 | 4/19/2017 | 4/19/2017 | A | DONE |
Jim Page
|
|
|
Underground main supply flush complete
|
INSP-Supply line flush | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Katie Marron
|
|
|
Underground supply pipe ok to cover.
No flush was completed
|