Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR16-00806
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 12463 W FAIRVIEW AVE
Project NameMAVERICK CAR COMPANY
Customer Number 
ePlanReviewYes
Description
[Maverick Car Company]
The fire sprinkler scope of work consists of a wet system protecting a one level building with a mezzanine. The mezzanine is Light hazard and the remainder of the building is OH 2. The 6” underground supplies a 3” backflow preventer and riser to a 2 ½” x2”x1 ½” grid. The mezzanine is a side feed design with 2 ½” main and telescoping branch lines.

? There is to be NO flammable finish operations without a complete new fire sprinkler review.

The underground piping is under permit FIR16-00712

[BLD16-02889] – Permit for the construction of a new 6,119 Sq. Ft. 1 story with a 945 sq. ft. mezzanine, 5,530 grade level and 539 sq. ft. of covered parking building areas include office, showroom, exterior covered parking , and a car detailing shop with work to include site grading and utilities and the construction of a new steel building. this building is fully fire sprinklered to allow for the larger mezzanine and common path of travel of 100 feet. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20177/25/20177/25/2017APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection7/13/20177/14/20177/14/2017PFAIL
DetailsTroy Cobbley
Provide test papers and testing of the outside alarm bell when installed. Forward flush passed
INSP-Sprinkler Rough-in5/3/20175/3/20175/3/2017PCANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Sprinkler Rough-in5/2/20175/3/20175/3/2017APASS
DetailsTroy Cobbley
Earth quake bracing and branchline restraints have been corrected. All piping can be covered
INSP-Sprinkler Rough-in5/1/20175/1/20175/1/2017PPASS
DetailsTroy Cobbley
Overhead hydro passed. Piping under the mezzanine ok to cover as branchline restraints have been added.
INSP-Sprinkler Rough-in4/27/20174/28/20174/28/2017APART
DetailsTroy Cobbley
Rough-in passed for the most part. However I need verification on whether one or two screws are required for the side beam brackets, seismic calculations need to be resubmitted for the actual location of the bracing or install bracing as per plan, it appears that branchline restraints are required for nearly every branchline. Piping can be covered.