INSP-Final Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Page
|
|
|
Rough in inspection for this system has been completed.
|
INSP-Final Inspection | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | CANC |
Troy Cobbley
|
|
|
Canceling due to manpower shortage and time constraints. Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | CANC |
Jim Page
|
|
|
Rescheduled for 01AUG2019 per conversation with point of contact, this request is cancelled.
Please call Clarence Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Jim Page
|
|
|
Per conversation with my supervisor, Adele Schaffeld-Griffin, notes entered reading "Final fire sprinkler sign off of inspections for this permit will be completed at the same time as the life safety inspection is completed under the building permit." Please coordination with the general contractor to schedule the final inspections. Onsite inspection request for today will need to be rescheduled until coordinated inspections for the life safety can be scheduled.
Clarence Phone #: ###-####
|
INSP-Final Inspection | 6/29/2017 | 6/30/2017 | 6/30/2017 | P | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for this permit is complete, permit will remain in issued status until construction for this permitted area is complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2017 | 6/9/2017 | 6/9/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for systems 10-2 and 10-6 complete.
|
INSP-Sprinkler Rough-in/Hydro | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | CANC |
Jim Page
|
|
|
Hydrostatic test cancelled by contractor, Chris ###-####
|