Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberFIR16-00810
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 5823 W FRANKLIN RD
Project NameBOISE INTERNATIONAL MARKET
Customer Number 
ePlanReviewYes
Description
[Boise International Market]
The fire sprinkler scope of work consists of a new OH 2 sprinkler system in an existing building. The system is supplied by new 6” underground through a 3” backflow preventer to a 3” riser out to a 2 ½”x 2 ½” x 1 ¼” grid.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-na] – There does not seem to be an associated building permit at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/31/20192/1/20192/1/2019APASS
DetailsTroy Cobbley
permit finaled

Thanks. Call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in11/7/201811/8/201811/8/2018APASS
DetailsTroy Cobbley
The rough-in passed. This permit will be able to be finaled when the fire alarm system interconnection has been tested that Crane Alarm is installing.

Brodie Stenquist Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in/Hydro3/30/20173/30/20173/30/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Supply line flush2/16/20172/17/20172/17/2017APASS
DetailsTroy Cobbley
Underground supply line flush passed
INSP-Sprinkler Rough-in2/16/20172/16/20172/16/2017PPASS
DetailsTroy Cobbley
Underground hydo test passed. Rough-in inspection passed. Plan modifications are needed since the west sprinkler main/building layout does not match the actual conditions and this will change the hydraulic calculations.
INSP-Sprinkler Rough-in2/14/20172/14/20172/14/2017PPASS
DetailsJim Page
The thrust block at the base of the IBR has been inspected and is approved for cover.
INSP-Sprinkler Rough-in2/14/20172/14/20172/14/2017PPART
DetailsTroy Cobbley
The underground piping on the exterior of the building is ok for cover. The thrust block at the base of the IBR has not been installed yet and will require another inspection prior to cover.