INSP-Final Inspection | 1/31/2019 | 2/1/2019 | 2/1/2019 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Thanks. Call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Troy Cobbley
|
|
|
The rough-in passed. This permit will be able to be finaled when the fire alarm system interconnection has been tested that Crane Alarm is installing.
Brodie Stenquist Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 2/16/2017 | 2/16/2017 | 2/16/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground hydo test passed. Rough-in inspection passed. Plan modifications are needed since the west sprinkler main/building layout does not match the actual conditions and this will change the hydraulic calculations.
|
INSP-Sprinkler Rough-in | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | PASS |
Jim Page
|
|
|
The thrust block at the base of the IBR has been inspected and is approved for cover.
|
INSP-Sprinkler Rough-in | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | PART |
Troy Cobbley
|
|
|
The underground piping on the exterior of the building is ok for cover. The thrust block at the base of the IBR has not been installed yet and will require another inspection prior to cover.
|