[Aberdeen Phase 5 Building B-2]
The fire sprinkler scope of work consists of CPVC piping is being used with extended coverage residential sprinklers to protect a two level, eight-unit apartment building using NFPA 13R

The underground is under permit FIR16-00781

[BLD16-02650] – Permit for the construction of a new 8,028 sq. ft., two story building including 420 sq. ft. of common entry area and covered patios. The building is comprised of 4, 951, sq. ft. type B units on the first story and 4, 951 sq. ft. units on the second story with each unit accessed through a common entry area. The building is to be constructed per the approved plans and the attached engineering. The building is fully fire sprinklered with a NFPA 13R system for R occupancies. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/25/20175/26/20175/26/2017APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection5/23/20175/25/20175/25/2017AFAIL
DetailsTroy Cobbley
Two concealer heads are located too far from ceiling, two sidewall heads have the shipping clips on them. Flow switches have not been pre-tested. Flow switches do not have covers installed
INSP-Sprinkler Rough-in4/20/20174/20/20174/20/2017PFAIL
DetailsTroy Cobbley
I stopped at the project site and did not make contact with Colton or with Pat. No inspection was performed.

Colton Phone #: ###-####
INSP-Sprinkler Rough-in4/6/20174/6/20174/6/2017PPASS
DetailsTroy Cobbley
Re-routing of the underground piping has been approved. All sprinkler piping in the building can be covered.
INSP-Sprinkler Rough-in/Hydro4/5/20174/5/20174/5/2017PPASS
DetailsTroy Cobbley
Overhead hydro passed and tenting in apartments 203 and 204 passed and piping can be covered. However piping can not be covered on the first floor until approved plans have been received that show the underground pipe routing changes.
INSP-Sprinkler Rough-in3/29/20173/30/20173/30/2017PPART
DetailsTroy Cobbley
Todays inspection was for the rough-in for the whole building. 90's are missing at the top and bottom of the second floor feed. The only areas where piping can be covered are in the upstairs apartments 201 and 202 since these were the only two which had tenting. Need resubmittals showing the underground supply piping being routed above ground to the new riser room.