Permit Information
Permit NumberFIR17-00002
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2403 S LIBERTY RD
Project NameBA Fischer Office & Warehouse
Customer Number 
ePlanReviewYes
Description
[BA Fischer Office & Warehouse]
The fire sprinkler scope of work consists of gridded wet system for High Piled Storage. There is also a mezzanine with offices. There is a 4” riser with backflow preventer which supplies the 4”x2½”x 1½”grid.

The underground is under permit FIR16-0811

Location on Plan - Warehouse
Commodity - Irrigation Tubing
Classification - Class 1
Storage Type (rack, solid pile, etc.) - Rack
Pallet Type (wood or plastic) - Pallet
Aisle Width - 8’
Height of Storage - 16’
Ceiling Height - 22’-7”
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - N
Sprinkler Type - K=8.0
High Temperature Sprinklers Required - Yes
Applicable NFPA Section - 16.2.1.3.2, Fig 16.2.1.3.2 (a), Fig 16.2.1.3.4.1
Hydraulic Design Criterion - .29 – 65% .19/2000
Hose Stream Requirements - 500


[BLD16-03774] – Permit for the construction of a new 17,720 sq. ft. two story warehouse/office building with work to include the construction of a premanufactured steel structure with a concrete foundation and concrete slab floor. This is a fully fire sprinklered building for height and the S-1 occupancy. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/7/20176/7/20176/7/2017PPASS
DetailsTroy Cobbley
permit finaled. Forward flow passed. No storage racking at this time
INSP-Sprinkler Rough-in/Hydro5/9/20175/10/20175/10/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro5/8/20175/9/20175/9/2017ACANC
DetailsTroy Cobbley
Cancel per John Beazer due to leak found after start of test
INSP-Sprinkler Rough-in5/3/20175/4/20175/4/2017APASS
DetailsTroy Cobbley
Previous corrections have been made except the revised plans do not show the two new heads that may need to be included in the Remote Area 1 calcs. Also many of the pendant heads in the office area are now uprights. Please forward this information to the plan reviewer. All other corrections have been made and rough-in is passed.
INSP-Sprinkler Rough-in4/28/20175/1/20174/28/2017PCANC
DetailsTroy Cobbley
John Beazer is the contact for this inspection. He is requesting a rough to cover inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Kay Haney Inspection cancelled from web by: Kay Haney
INSP-Sprinkler Rough-in4/26/20174/27/20174/27/2017PPART
DetailsTroy Cobbley
Plans need to be resubmitted for plan modifications that include the actual pipe routing and fitting counts, branchline restraints are missing on the two most south west branchlines, branch line restraints are required on the grid branchlines (41'max), FDC is not approved at its current location, heads are spaced too far off of a wall at the west end of the building, piping over Conference room can be recovered, the nuts on the side sammys can be unthreaded by finger so they need to be tightened down.