Permit NumberFIR17-00038
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 280 S CAPITOL BLVD
Project NameUMPQUA BANK T.I.
Customer Number 
ePlanReviewYes
Description
[Umpqua Bank TI]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration. All pendent sprinklers are being changed to QR.

Plan Mod #1 – 2/06/2017
Added protection to the vaults

Change all of the sprinklers in the top right of the second floor to quick response.

[BLD16-03422] – The fire sprinkler system is used to allow non-rated corridors, to allow no exterior wall openings for the basement, and for story increase. To remodel the 4,808 square foot interior area on the 7,600 square foot 1st story and to remodel a 6,050 square feet area on the 7,600 square foot 2nd story for a new bank tenant. Selective nonstructural interior demolition is also covered under this permit. Work is to include 2 restrooms accessible to the disabled on the 1st story, upgrades to the 2nd story restrooms to make them accessible to the disabled, upgrading the entry vestibules on the 1st story to make them accessible to the disabled, interior doors, interior windows, interior nonstructural infill walls, interior nonstructural walls, suspended acoustical ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/3/20174/4/20174/4/2017PPASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Sprinkler Rough-in3/23/20173/24/20173/24/2017PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/pendant heads on level 1 complete, level 1 approved for cover.
INSP-Sprinkler Rough-in2/23/20172/23/20172/23/2017PPART
DetailsJim Page
Rough to cover inspection on level 2 stairs complete, approved for cover.
INSP-Sprinkler Rough-in2/21/20172/22/20172/22/2017APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 approved for cover.