INSP-Final Inspection | 11/6/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work passed/complete.
|
INSP-Sprinkler Rough-in | 11/6/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Page
|
|
|
Rough in inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 11/3/2017 | 11/6/2017 | 11/6/2017 | A | CANC |
Jim Page
|
|
|
Could not connect with point of contact, Clarence Phone #: ###-####, inspection request will need to be rescheduled.
|
INSP-Final Inspection | 11/2/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed. Did not have time to perform the rough-in
|
INSP-Final Inspection | 11/1/2017 | 11/3/2017 | 11/2/2017 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sheldon Gray Inspection cancelled from web by: Jessia Maxwell
|