Permit Information
Permit NumberFIR17-00114
StatusFinaled
Name FIRE SENTRY SYSTEMS
Site Address 850 W FRONT ST
Project NameBoise Centre Phase III
Customer Number 
ePlanReviewYes
Description
Add SLC devices to existing circuits 1 an 2. Includes Smoke, Heat, Sprinkler flow, tamper, and pressure monitoring. HVAC monitoring and shutdown. Elevator Shaft Monitoring. A notification speakers and stobes to existing NAC Panel F and add New NAC Panel G. Add New Audio Amp #5. Restore previously programmed, required smoke control sequence for entire building. Associated with building permit BLD16-04536.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/23/201710/26/201710/26/2017APASS
DetailsTroy Cobbley
Permit finaled. Supervisory signals were verified by Lee at all three buildings today.
INSP-Final Inspection10/23/201710/24/201710/23/2017ACANC
DetailsJim Page
Rafael Castillo w/ Lea Electric will be onsite for inspection Phone #: ###-#### >> Inspection requested via web by John Siewert Inspection cancelled from web by: John Siewert
INSP-Final Inspection9/6/20179/7/20179/7/2017APART
DetailsJim Page
Final fire alarm inspection partially complete, need to verify requirements with the fire alarm plan reviewer for audio/visual notification on the link between the grove hotel, century link arena as well as the district building.
INSP-Final Inspection9/5/20179/6/20179/6/2017PCANC
DetailsJim Page
Inspection request will be rescheduled due to issues with a NAC panel, this inspection request is cancelled.
INSP-Final Inspection9/5/20179/6/20179/6/2017ACANC
DetailsJim Page
John Phone #: ###-####
INSP-Final Inspection8/31/20179/5/20179/5/2017PCANC
DetailsJim Page
Tech - Kc Strykowski

Consolidated with FIR16-00777 and FIR17-00340 Phone #: ###-#### >> Inspection requested via web by John Siewert Inspection cancelled from web by: John Siewert
INSP-Final Inspection8/15/20178/16/20178/16/2017PFAIL
DetailsTroy Cobbley
No city approved plans on site. No inspection performed. As previously stated plans need to be re-submitted and smoke evac zones need tested.
INSP-Final Inspection7/14/20177/17/20177/17/2017PCANC
DetailsJim Page
Inspection of signals to neighboring buildings. Phone #: ###-#### >> Inspection requested via web by Chris Siewert Inspection cancelled from web by: Chris Siewert
INSP-Final Inspection6/29/20176/30/20176/30/2017PPART
DetailsTroy Cobbley
Temp c of o, phase 3 fire alarm is complete. Fire alarm plans need to be resubmitted for a plan mod due to changes
INSP-Final Inspection3/29/20173/30/20173/30/2017APART
DetailsJim Page
Partial final complete for fire alarm system. Area's inspected consist of link between GBAD, Century Link and Boise Center, audio visual devices tested good as well as escalator lobbies on level 1 and level 2. Area's requested for TCO passed/complete (GBAD, Century Link, Boise Center and elevated concourse between Boise Center and west stairwell)
INSP-Final Inspection3/29/20173/29/20173/29/2017PCANC
DetailsJim Page
Scheduled for 30MAR2017