INSP-Final Inspection | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jim Page
|
|
|
Final underground inspection passed/complete
|
INSP-Supply line flush | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | PASS |
Troy Cobbley
|
|
|
Under ground supply line flush passed
|
INSP-Sprinkler Rough-in/Hydro | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Troy Cobbley
|
|
|
Under ground hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection complete for the underground supply, straight sections of pipe approved for cover, all thrust blocks at changes of direction will be poured and inspected at a later date.
|