Permit Information
Permit NumberFIR17-00144
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 7380 W SAXTON DR
Project NameKensington Apts Bldg A
Customer Number 
ePlanReviewYes
Description
[Kensington Apartments - Building A]
The fire sprinkler scope of work consists of a NFPA 13R system for a two level apartment building. The system is supplied by 2” underground through a 2” backflow preventer to (2) 1½” flow control risers.. The system piping is CPVC with extended coverage residential sprinklers.


[BLD15-01118] - The NFPA 13-R fire sprinkler system is used for occupancy. To construct a 9,258 square foot two story apartment building (5,342 sq. ft. 1st story with four 2.a units and 3,916 sq. ft. 2nd story with four 1.b units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20-minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridor, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/8/201710/9/201710/9/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete
INSP-Final Inspection9/8/20179/11/20179/11/2017PCANC
DetailsJim Page
Fire alarms are not ready, final fire sprinkler ispection will be scheduled to coincide with fire alarm final, this request is cancelled.
INSP-Supply line flush8/1/20178/2/20178/2/2017ADONE
DetailsJim Page
Underground supply line flush complete
INSP-Supply line flush8/1/20178/2/20178/1/2017ACANC
DetailsJim Page
Trying to coordinate a time with Stacy at Suez. Call Jake in AM to discuss. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro7/20/20177/21/20177/21/2017APASS
DetailsTroy Cobbley
Underground hydro test passed.
INSP-Supply line flush7/20/20177/21/20177/21/2017ACANC
DetailsTroy Cobbley
To be rescheduled per Jake
INSP-Sprinkler Rough-in/Hydro6/27/20176/28/20176/28/2017APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover. Hydrostatic test for overhead fire sprinkler piping complete.
INSP-Sprinkler Rough-in/Hydro6/26/20176/27/20176/27/2017ACANC
DetailsTroy Cobbley
Can't do the hydro test until all of the heads have been cut in and piping installed
INSP-Sprinkler Rough-in/Hydro6/26/20176/26/20176/26/2017PCANC
DetailsTroy Cobbley
Please let Jake know when you are heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in/Hydro6/22/20176/23/20176/23/2017ACANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, Jake Phone #: ###-####, inspection will be rescheduled for a later date.
INSP-Sprinkler Rough-in/Hydro6/20/20176/21/20176/21/2017ACANC
DetailsJim Page
Inspection request cancelled per conversation with point of contact, Jake Phone #: ###-####, inspection will be rescheduled for a later date.