INSP-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | PART |
Jim Page
|
|
|
Partial final inspection complete for overhead fire sprinklers. Irrigation needs to isolate when flow switch activates, permit cannot be finaled until irrigation isolation on flow switch activation is verified.
|
INSP-Final Inspection | 1/16/2018 | 1/18/2018 | 1/17/2018 | A | CANC |
Troy Cobbley
|
|
|
Probably won’t be ready until 10:00 am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Final Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 8/7/2017 | 8/9/2017 | 8/9/2017 | A | PART |
Jim Page
|
|
|
Tenting inspection complete, insulating contractor needs to provide documentation for the foam blow in insulation for compatibility with CPVC, cover is approved at builders discretion based on compatability report, if blow in insulation is not compatible then foam covered fire sprinkler piping will need to be replaced.
|
INSP-Sprinkler Rough-in | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PART |
Jim Page
|
|
|
Rough in inspection complete for overhead fire sprinkler piping/pendant heads. Area's between conditioned living spaces approved for cover, all other piping requires tenting, piping not between conditioned spaces cannot be covered until tenting inspection is complete.
|