Permit Information
Permit NumberFIR17-00212
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1101 W FRONT ST
Project NamePIONEER PARKING GARAGE
Customer Number 
ePlanReviewYes
Description
[Pioneer Parking Garage - Standpipe]
THIS IS A MANUAL DRY STANDPIPE SUPPLIED FROM THE CITY FIRE TRUCKS.
ALSO INSTALL 6" FIRE LINE AS SHOWN FOR THE POSSIBLE FUTURE TENANT SPACE ON THE 1ST FLOOR. THIS FIRE LINE WILL BE CAPED OFF ABOVE THE FLOOR FOR THE POSSIBLE FUTURE FIRE SPRINKLER SYSTEM IN THE PROPOSED FUTURE TENANT SPACE.


Plan Mod #1 – 8/22/2017
Added the fifth floor.


[BLD16-03292] – Permit for the construction of a 228,548 sq. ft., 4 tier parking garage including 13,392 sq. ft. of office area on the first story to be type IB construction with work to in garage construction and general site grading and utilities per the approved plans and any notations. The office requires a separate permit for the tenant improvement and occupancy of this area. This building is to be fully fire sprinklered per NFPA 13. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/23/20181/24/20181/24/2018APASS
DetailsJim Page
Final inspection for manual dry standpipe complete.
INSP-Sprinkler Rough-in/Hydro1/24/20181/24/20181/24/2018ADONE
DetailsJim Page
Hydrostatic test for manual dry standpipe complete, no pressure loss observed at riser supplied gauge.
INSP-Sprinkler Rough-in/Hydro1/23/20181/24/20181/24/2018APASS
DetailsJim Page
Standpipe rough in inspection complete.
INSP-Final Inspection1/10/20181/16/20181/16/2018APART
DetailsJim Page
Partial final inspection complete for MANUAL DRY STANDPIPE, levels 1, 2 and 3 inspection complete.
INSP-Sprinkler Rough-in/Hydro1/9/20181/11/20181/11/2018PPASS
DetailsTroy Cobbley
24 hour air test on both systems passed
INSP-Sprinkler Rough-in/Hydro1/9/20181/10/20181/10/2018PPART
DetailsJim Page
24 hour air test started on level 1 standpipe at 1PM with 41 PSI on both systems.
INSP-Final Inspection1/5/20181/8/20181/8/2018ADONE
DetailsJim Page
Underground flush complete.
INSP-Sprinkler Rough-in/Hydro10/17/201710/17/201710/17/2017PPASS
DetailsJim Page
Underground hydrostatic test complete.