INSP-Final Inspection | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Jim Page
|
|
|
Final inspection for manual dry standpipe complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/24/2018 | 1/24/2018 | 1/24/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for manual dry standpipe complete, no pressure loss observed at riser supplied gauge.
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Jim Page
|
|
|
Standpipe rough in inspection complete.
|
INSP-Final Inspection | 1/10/2018 | 1/16/2018 | 1/16/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection complete for MANUAL DRY STANDPIPE, levels 1, 2 and 3 inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test on both systems passed
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PART |
Jim Page
|
|
|
24 hour air test started on level 1 standpipe at 1PM with 41 PSI on both systems.
|
INSP-Final Inspection | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | DONE |
Jim Page
|
|
|
Underground flush complete.
|
INSP-Sprinkler Rough-in/Hydro | 10/17/2017 | 10/17/2017 | 10/17/2017 | P | PASS |
Jim Page
|
|
|
Underground hydrostatic test complete.
|