Permit Information
Permit NumberFIR17-00275
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 7552 W VICTORY RD
Project NameVICTORY CENTER SHELL BUILDING
Customer Number 
ePlanReviewYes
Description
[Victory Center Building - Shell]
The fire sprinkler scope of work consists of a spec warehouse designed as an ESFR sprinkler system. New 8” underground will supply an 8” backflow preventer, riser and feed main. The system is designed as a 6”x4”x2½” grid with ESFR K=25.2 sprinklers.

Location on Plan - Warehouse
Commodity - Spec Warehouse
Classification - Group I-IV commodity and Group A plastic
Storage Type (rack, solid pile, etc.) - Rack
Pallet Type (wood or plastic) - Wood
Aisle Width - 8’
Height of Storage - 20’
Ceiling Height - 25’
Encapsulated - No
Solid Shelves - No
Smoke and Heat Vents - No
Draft Curtain - No
In Rack Sprinklers - No
Sprinkler Type - ESFR K=25.2
High Temperature Sprinklers Required - No
Applicable NFPA Section - T-17.2.3.1
Hydraulic Design Criterion - 15 Psi., (12) Sprinklers
Hose Stream Requirements - 250

[BLD17-00763]
The fire sprinkler system is used for building area increase and for fire area. To construct a 21,885 square foot shell building for future occupancy under separate tenant improvement permits. Work is to include concrete footings, concrete foundation, concrete piers, concrete slab on grade, exterior concrete sidewalks and aprons, uninsulated 56 inch tall masonry exterior walls, steel beams, steel columns, steel moment frames, steel roof purlins, steel cross bracing, horizontal steel wall purlins, steel exterior wall panels, steel roof panels, liner roof insulation system, wall insulation, a 1-hr fire-resistance-rated fire sprinkler riser room, exterior side-hinged swinging doors,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/4/201712/6/201712/6/2017APASS
DetailsTroy Cobbley
Permit finaled. Forward flush passed
INSP-Sprinkler Rough-in/Hydro12/4/201712/5/201712/5/2017PPASS
DetailsTroy Cobbley
Hydrotest for overhead shell system passed
INSP-Final Inspection12/4/201712/6/201712/4/2017PCANC
DetailsTroy Cobbley
We would like to coordinate this in conjunction with final for the Curtis restaurant TI FIR 17-00690 Phone #: ###-#### >> Inspection requested via web by Jeff Packham Inspection cancelled from web by: Jeff Packham
INSP-Sprinkler Rough-in12/1/201712/1/201712/1/2017APASS
DetailsTroy Cobbley
Need all typical items for final, signs/stickers..ect and also need the pipe sizing to the heads under hvac units and doors addressed and heads changed out at the unit heaters.
INSP-Supply line flush11/28/201711/28/201711/28/2017APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Supply line flush11/14/201711/14/201711/14/2017PCANC
DetailsTroy Cobbley
Cancel per Troy Phone #: ###-####
INSP-Sprinkler Rough-in10/30/201710/30/201710/30/2017PPASS
DetailsTroy Cobbley
Piping/pendant in riser room is ok to cover.
INSP-Conference10/24/201710/25/201710/25/2017ADONE
DetailsTroy Cobbley
Jeff Packham and I discussed getting the shell/core signed off as well as the T.I.
INSP-Sprinkler Rough-in/Hydro9/25/20179/25/20179/25/2017PPASS
DetailsTroy Cobbley
UG hydro passed
INSP-Sprinkler Rough-in9/13/20179/14/20179/13/2017APASS
DetailsJim Page
Rough to cover inspection for remaining underground complete, underground supply approved for cover.
INSP-Sprinkler Rough-in/Hydro8/22/20178/23/20178/23/2017APASS
DetailsTroy Cobbley
Not ready for hydro. Rough-in passed but still waiting for the piping to be installed under overhead doors. Tim Frost approved the revised earthquake attachments. Also letter was received as required in note #1 of the review comments.

Randy Phone #: ###-####
INSP-Sprinkler Rough-in8/2/20178/2/20178/2/2017PPASS
DetailsTroy Cobbley
Todays inspection was to verify hanger attachments to the roof structure prior to cover. Attachments can be covered.
INSP-Sprinkler Rough-in6/28/20176/28/20176/28/2017PPASS
DetailsTroy Cobbley
IBR only is ok to cover. The remaining piping will be installed later. No thrust block, mechanical restraint is being used.