Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00303
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12142 W JOPLIN RD
Project NameBDF - TRAINING/SAFETY
Customer Number 
ePlanReviewYes
Description
[Boise Fire Department - Training & Safety Building]
The fire sprinkler scope of work consists of a training center for the Boise Fire Department, which consist of apparatus bays, classrooms and office. The building has mason walls open web joist and steel pan deck. It is 9813 ft². The building is conditioned throughout and there is one wet system for the building. There is one combustible overhang that is protected with dry type sprinkler heads. The sprinkler design occupancy is OH-2

[BLD16-04079]
To meet 2012 International Green Construction Code as adopted. To construct a 9,813 sq. ft. one story commercial business building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, CMU exterior envelope walls, open web steel roof joist, steel roof decking, electrical, mechanical and plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Sprinklers used for area increase. This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. Note: This building requires a Preoccupancy Commissioning Report, this report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/26/20183/27/20183/27/2018APASS
DetailsTroy Cobbley
permit finaled

Todd Ketterling is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection3/22/20183/23/20183/23/2018AFAIL
DetailsTroy Cobbley
Was unable to test devices due to fire alarm permit issues. The forward flush test failed due to a lack of flow/pressure
INSP-Sprinkler Rough-in1/19/20181/19/20181/19/2018PPASS
DetailsTroy Cobbley
Piping above the lay-in ceilings is ok for cover.
INSP-Sprinkler Rough-in/Hydro1/17/20181/19/20181/19/2018APASS
DetailsTroy Cobbley
The overhead hydro test passed.

odd Ketterling is the contact for this overhead hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush12/1/201712/4/201712/4/2017APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in11/30/201712/1/201712/1/2017PPASS
DetailsTroy Cobbley
Piping above the hard lids is ok for cover. I noted electrical boxes located close to the pendants that may pose an obstruction problem.
INSP-Sprinkler Rough-in10/25/201710/26/201710/26/2017APASS
DetailsTroy Cobbley
Overhead rough-in passed. Corrections have been made to the seismic bracing. No cover, except hardlids until the pendants/drops have been installed and verified.
INSP-Sprinkler Rough-in/Hydro10/23/201710/24/201710/24/2017APASS
DetailsTroy Cobbley
Underground supply line hydro passed. I also did a partial rough-in on just the overhead pipe, hangers and seismic bracing. Minor corrections are needed. No piping can be covered until corrections and all drops are installed and inspected.
INSP-Sprinkler Rough-in8/23/20178/23/20178/23/2017PPASS
DetailsTroy Cobbley
Remaining underground supply piping from the IBR to the point of connection can be covered.
INSP-Sprinkler Rough-in7/17/20177/17/20177/17/2017PPART
DetailsJim Page
Partial rough to cover inspection complete for the underground, in building riser for building stub up approved for cover, remaining underground to be installed at a later date.