Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberFIR17-00304
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 12553 W EXPLORER DR
Project NameMARVELL SEMICONDUCTOR TI
Customer Number 
ePlanReviewYes
Description
[Marvell Semiconductor]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration. All sprinklers are being changed to quick response type,
[BLD17-01639]
Office renovation, new conference room and lab relocation, new ceiling grid and tiles, new light fixtures, new carpet, vct flooring, paint and miscellaneous interior finishes. This building is fully fire sprinklered any alterations to the fire sprinkler system shall be per NFPA#13. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/25/20177/25/20177/25/2017PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection7/20/20177/21/20177/21/2017AFAIL
DetailsTroy Cobbley
Permit can not be finaled due to ceiling tiles missing through-out project. Annual inspection on riser needs to be verified.
INSP-Sprinkler Rough-in7/14/20177/17/20177/17/2017APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in area of work complete, approved for cover.
INSP-Sprinkler Rough-in6/29/20176/29/20176/29/2017PDONE
DetailsTroy Cobbley
Adam and I spoke about the two heads off of a single outlet. Hydraulic calculations will be required or piping will need to match plans.