Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00305
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12142 W JOPLIN RD
Project NameBDF - Administration/classroom
Customer Number 
ePlanReviewYes
Description
[Boise Fire Department - Administration and Classroom]
The fire sprinkler scope of work consists of a training center for the Boise Fire Department, which consists of offices classrooms and conference room. mason walls, steel open web joist, steel pan deck. It is 5926sqft. The building is conditioned. There is one wet system. There are two combustible overhangs protected with dry heads. Pitch of the roof deck is 5:12 a 30% added to the hydraulic area. The system has above and below protection and has a tree type layout with 4” mains and 1½” lines.

[BLD16-04077]
To meet 2012 International Green Construction Code as adopted. To construct a 9,813 sq. ft. one story commercial business building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, CMU exterior envelope walls, open web steel roof joist, steel roof decking, electrical, mechanical and plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. Sprinklers used for area increase. This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. Note: This building requires a Preoccupancy Commissioning Report, this report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/15/20183/16/20183/16/2018APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection3/12/20183/13/20183/13/2018AFAIL
DetailsTroy Cobbley
Forward flush passed, need backflow tagged, need pad at the PIV. Could not test devices due to fire alarm permit issued.
INSP-Sprinkler Rough-in/Hydro1/9/20181/10/20181/10/2018APART
DetailsTroy Cobbley
The overhead hydro test passed. The sprinkler coverage for the east exterior canopy has been modified. There are two small shadowed areas that Todd Ketterling could not address with the materials/design provided. I spoke to Scott about it and he approved it. Sprinkler coverage still needs to be provided under the overhead door.

Todd Ketterling is the contact for this overhead hydro inspection for the admin. building. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/8/20181/9/20181/9/2018PPART
DetailsTroy Cobbley
Piping above the lay-in ceilings is ok to cover. Sprinkler coverage is required under the overhead door. Also the dry sidewall heads on under the east canopy are less than 4" from the underside of the soffit.
INSP-Supply line flush12/1/201712/4/201712/4/2017APASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in10/25/201710/26/201710/26/2017APASS
DetailsTroy Cobbley
Overhead rough-in passed. Corrections have been made to the seismic bracing. No cover, except hardlids until the pendants/drops have been installed and verified.
INSP-Sprinkler Rough-in/Hydro10/23/201710/24/201710/24/2017APASS
DetailsTroy Cobbley
Underground supply line hydro passed. I also did a partial rough-in on just the overhead pipe, hangers and seismic bracing. Minor corrections are needed. Per Todd resubmittals are in the works. No piping can be covered until corrections, plan mods and all drops are installed and inspected.

Todd Ketterling Phone #: ###-####
INSP-Sprinkler Rough-in8/4/20178/7/20178/7/2017APART
DetailsTroy Cobbley
Rough to cover for 7'-0" from the building only. The remaining piping was not installed by Shilo. A separate permit will be required for this work from a licensed sprinkler contractor or Shilo will need to accept responcibility for this work. Shilo will need to resubmit plans for a change of scope. Plans need to be submitted showing the additional fittings in the underground supply line. Per Brian, the installer, the top of pipe is 5'-1" at the doorway/floor and is at 4'-9" at the connection. There is no sidewalk or land scaping just smooth travel from the door to the low point in the parking lot. If changes are made in the parking lot piping will need to be dug up and modified to the correct depth.