Information based on query as of Monday, July 15, 2024.
Permit Information
Permit NumberFIR17-00309
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 12142 W JOPLIN RD
Project NameCOMMERCIAL TRAINING BURN BUILD
Customer Number 
ePlanReviewYes
Description
[Commercial Training Building]
The fire sprinkler scope of work consists of a five level commercial training tower with simulated various occupancy. The building is unoccupied, unconditioned and only used for training exercises. There is NO sprinkler system. There will be two manual dry standpipes which are NOT interconnected.

[BLD16-04428]
To construct a 15,945 sq. ft. non-occupied unconditioned firefighting training prop/building to resemble a five story commercial building, Note: alternate approval to the code (see documents attached in agency comments). Scope of work includes: construction of a slab on grade concrete foundation, CMU and concrete exterior walls, concrete floors and ceiling slabs, interior CMU walls creating rooms/areas to simulate different areas found in a commercial building (for example to simulate retail space, office areas, hotel lounge/lobby areas, hotel rooms, reception areas, conference room and storage areas), electrical work and related site improvements. This building is Not Fire Sprinklered. Note: Special Inspections Required see form 310. Note: roof canopy design calcs & plans are deferred submittals - no work on new roof canopy allowed until required engineering plans and calculations have been reviewed and approved by the pds plan review dept. **jg**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/30/20185/31/20185/31/2018APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro3/29/20183/30/20183/30/2018APASS
DetailsTroy Cobbley
Permit finaled. Overhead hydro test passed. Placards are on order.

Todd Ketterling is the contact for this hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/28/20183/29/20183/29/2018PCANC
DetailsTroy Cobbley
To be rescheduled.

Todd Ketterling is the contact for this Hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in3/26/20183/27/20183/27/2018APART
DetailsTroy Cobbley
Installation for the most part is ok. One four way brace at the top of Stair #2 is missing as well as flexible cplgs through a CMU wall. The position of the hose valves in Stair #1 need to be relocated (swung) as per conversation away from the roof drain line as well as possible drainage concerns. It appears the FDC and drain out of the west side of the building interferes with the stairwell door and will need to be relocated.


Todd Ketterling is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus