Permit Information
Permit NumberFIR17-00324
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 7738 W EMERALD ST
Project NameMarena Bldg 7
Customer Number 
ePlanReviewYes
Description
[Marena Building #7]
The fire sprinkler scope of work consists of two level four plex protected per NFPA 13R. The top level will have the piping tented. The sprinklers are residential type.

[BLD16-04313]
For the construction of a 3,680 sq. ft. 2 story 4 plex with work to include general site work and construction of the building per the approved plans. This building is fully fire sprinklered for R-2 occupancy. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/13/201712/13/201712/13/2017PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/13/201712/13/201712/13/2017PPASS
DetailsJim Page
FDC is no longer blocked, final fire sprinkler inspection complete.
INSP-Final Inspection12/8/201712/11/201712/11/2017AFAIL
DetailsJim Page
FDC is blocked by air conditioner condensor.
INSP-Sprinkler Rough-in/Hydro12/8/201712/8/201712/8/2017PDONE
DetailsTroy Cobbley
Overhead hydro test complete
INSP-Supply line flush12/7/201712/8/201712/8/2017APASS
DetailsTroy Cobbley
Underground supply line flush passed

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Supply line flush12/1/201712/5/201712/5/2017AFAIL
DetailsTroy Cobbley
not ready

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in10/3/201710/4/201710/4/2017PPASS
DetailsTroy Cobbley
Rough-in passed. Tenting passed. Piping can be covered.
INSP-Sprinkler Rough-in9/27/20179/28/20179/28/2017APASS
DetailsTroy Cobbley
Rough-in passed. Tenting passed. Piping can be covered except for tie in area
INSP-Sprinkler Rough-in9/20/20179/21/20179/21/2017PPASS
DetailsTroy Cobbley
Underground supply piping can be buried.