INSP-Final Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Page
|
|
|
Final inspection completed on 7/20/2017, wrong inspection request was assigned at final inspection, request was for a rough in inspection.
|
INSP-Sprinkler Rough-in/Hydro | 7/18/2017 | 7/19/2017 | 7/20/2017 | P | PASS |
Jim Page
|
|
|
Inspection for Dry Chemical fire suppression system in paint booth passed/complete.
|