INSP-Final Inspection | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | FAIL |
Troy Cobbley
|
|
|
All devices tested and passed. Need plan modifications and NFPA record of completion forms when plans are approved.
|
INSP-Final Inspection | 10/20/2017 | 10/24/2017 | 10/24/2017 | P | FAIL |
Troy Cobbley
|
|
|
Today I was only able to verify strobe placement. See the city approved plans for locations where strobes are overspaced, too high or needing to be added. As-built needed prior to a final sign off. Small documents are missing. Data sheets are missing. No sprinkler interconnections have been pre-tested.
|