INSP-Final Inspection | 7/26/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Jon Beazer is the contact for this hydro/final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2018 | 7/30/2018 | 7/30/2018 | A | DONE |
Jim Page
|
|
|
Overhead hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
Jon Beazer is the contact for this Hydro/ Final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in new addition complete, approved for cover. Hydrostatic test will need to be completed on new addition.
|
INSP-Sprinkler Rough-in | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 approved for cover. Rough in inspection for level 1 complete, rough to cover inspection for overhead fire sprinkler piping located above hardlids on level 1 complete, level 1 hardlids approved for cover.
|
INSP-Sprinkler Rough-in | 2/26/2018 | 2/27/2018 | 2/27/2018 | P | CANC |
Scott Arellano
|
|
|
Mike Martin will be the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
*Inspection re-scheduled for tomorrow by applicant.*
|
INSP-Sprinkler Rough-in | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping in the west side 2 level addition complete. A rough to cover inspection will need to scheduled for finished heads before cover can be approved.
|