INSP-Final Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test at static pressure of 50 psi for overhead fire sprinkler piping witnessed, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|