INSP-Final Inspection | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed inspection
John Phone #: ###-####
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok for cover.
|