INSP-Final Inspection | 5/15/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
First thing in the morning if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | FAIL |
Scott Arellano
|
|
|
Flush could not be performed because domestic water was inadvertantly connected. Flush to be rescheduled.
|
INSP-Sprinkler Rough-in | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered.
Late morning if possible Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|