Permit Information
Permit NumberFIR17-00454
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1267 S BIRD ST
Project NameCimarron 4 plex bldg #10
Customer Number 
ePlanReviewYes
Description
[Cimarron Apartments 4 Plex Building #10]
The fire sprinkler scope of work consists of protecting a four plex per NFPA 13R. The majority of the piping is CPVC.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
[BLD17-02417]
The building permit plan review is not complete at this time.

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/17/20185/18/20185/18/2018APASS
DetailsTroy Cobbley
Permit finaled


Call Mike prior to heading out. Would like to do it as early as possible. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection5/15/20185/17/20185/17/2018AFAIL
DetailsTroy Cobbley
Display was not set up, I called mike when I was back in the area but could only leave a message. Will need to reschedule.


First thing in the morning if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro3/14/20183/14/20183/14/2018PPASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Supply line flush3/9/20183/12/20183/12/2018APASS
DetailsScott Arellano
Flush wItnessed
INSP-Sprinkler Rough-in2/19/20182/20/20182/20/2018APASS
DetailsTroy Cobbley
Tenting and pipe rough-in passed. Piping can be covered.
INSP-Sprinkler Rough-in1/15/20181/16/20181/16/2018APASS
DetailsTroy Cobbley
Underground supply line approved for cover.

Phone #: ###-#### Inspection requested via web by Sam Ball