INSP-Final Inspection | 6/25/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete.
Travis Phone #: ###-####
|
INSP-Final Inspection | 6/22/2018 | 6/25/2018 | 6/25/2018 | P | FAIL |
Jim Page
|
|
|
Sounder bases in rooms would not stay in alarm during general alarm, sounder bases need to keep sounding during general alarm.
Travis Phone #: ###-####
|
INSP-Final Inspection | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PART |
Jim Page
|
|
|
Inspection complete for room notification on levels 2 through 5. Fire sprinkler tampers and flow switches complete for levels 1 through 5, point description for standpipe control valves in riser room and level 2 roof top hose valve will be changed to discussed discription. Hood suppression monitoring is complete. Level 1 notification and common area notification and elevator recall to be tested at a later date. Monitoring needs to be verified prior to fire alarm permit being finaled.
Travis Phone #: ###-####
|