INSP-Final Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Jim Page
|
|
|
Underground supply permit finaled.
Clarence Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 6/15/2018 | 6/18/2018 | 6/18/2018 | P | DONE |
Jim Page
|
|
|
Underground supply hydrostatic test witnessed, no pressure loss obsrved at riser provided gauge.
Please Call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Supply line flush | 5/8/2018 | 5/10/2018 | 5/10/2018 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
INSP-Sprinkler Rough-in | 10/3/2017 | 10/3/2017 | 10/3/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for underground supply complete, riser and approximately 12 feet of pipe stubbed out from building inspected, area inspected approved for cover, remaining underground supply to be inspected at a later date.
|
INSP-Sprinkler Rough-in | 9/27/2017 | 9/28/2017 | 9/28/2017 | P | CANC |
Jim Page
|
|
|
Call Chris. Rough-In for underground feed. Phone #: ###-#### >> Inspection requested via web by Sheldon Gray Inspection cancelled from web by: Sheldon Gray
|