INSP-Final Inspection | 8/13/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Jim Page
|
|
|
Final inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 8/10/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Jim Page
|
|
|
Final underground supply inspection complete.
|
INSP-Supply line flush | 11/20/2017 | 11/22/2017 | 11/22/2017 | A | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in/Hydro | 11/17/2017 | 11/20/2017 | 11/20/2017 | A | PASS |
Jim Page
|
|
|
Underground supply hydrostatic test complete
|
INSP-Sprinkler Rough-in | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | PASS |
Jim Page
|
|
|
Underground supply rough to cover inspection complete, approved for cover.
|
INSP-Supply line flush | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | CANC |
Jim Page
|
|
|
Underground Hydro Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Sprinkler Rough-in | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | CANC |
Jim Page
|
|
|
Underground supply not ready to inspect, inspection request will be reschedule for a later date, this request is cancelled.
|
INSP-Supply line flush | 9/22/2017 | 9/22/2017 | 9/22/2017 | P | CANC |
Jim Page
|
|
|
Underground Rough-In Phone #: ###-#### Inspection requested via web by Connie Danes
|