INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
INSP-Sprinkler Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover for underground supply complete, stub up to approximately 15 feet from stub up approved for cover. Remaining underground to be installed at a later date.
|