Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR17-00643
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6707 S EISENMAN RD
Project NameGOWEN INDUSTRIAL PROJECT B
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Gowen Industrial Project - Building B - Underground Only] - Quick Permit
INSTALL APPROXIMATELY 23 FEET OF 8" C900 FROM THE 8" GATE VALVE, BY SUEZ, TO THE RISER ROOM OF BUILDING B AT THE GOWEN INDUSTRIAL PROJECT. AN 8" IBR WILL BE USED TO BRING THE FIRE WATER INTO THE RISER ROOM. ALL DIGGING, BEDDING, AND BACKFILL BY FP CONTRACTOR

There does not seem to be an associated building permit at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro4/24/20184/25/20184/25/2018ADONE
DetailsJim Page
Hydrostatic test for underground supply witnessed, no pressure loss observed at contractor provided gauge.
INSP-Supply line flush4/24/20184/25/20184/25/2018ADONE
DetailsJim Page
Underground supply flush complete.
INSP-Sprinkler Rough-in11/17/201711/17/201711/17/2017PPASS
DetailsTroy Cobbley
Todays inspection was for the stub-out only.. Its 8" with a thrust block and bury wire. Piping is ok to cover.