Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00647
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 1075 E PARK BLVD
Project NameChildren's Mental Health T.I.
Customer Number 
ePlanReviewYes
Description
[Children's Mental Health TI] - Quick Permti
Add and Relocated new sprinkler heads to new walls and ceiling grid layout.
ALL sprinklers are required to be QR.

[BLD17-02834]
The fire sprinkler system is used for building area increase and is used to substitute for a fire rated corridor and to allow nonrated openings in the West wall. To remodel an existing 10,811 square foot office tenant space to be used as a new medical office. Work is to include interior nonbearing walls, 6 toilet rooms accessible to the disabled, suspended acoustical ceilings, gypsum board ceilings, interior doors, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Existing columns, beams, and bearing walls are required to be maintained. The fire sprinkler system is required to be installed throughout the building in compliance with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/15/20183/15/20183/15/2018PPASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Final Inspection3/14/20183/15/20183/15/2018AFAIL
DetailsJim Page
Fire sprinkler heads in room 133 are lees than 6 feet apart, a minimum of 6 feet between heads is required.
INSP-Sprinkler Rough-in3/9/20183/9/20183/9/2018PPASS
DetailsJim Page
Rough to cover inspection for area of work complete, approved for cover.
INSP-Sprinkler Rough-in3/8/20183/9/20183/9/2018PFAIL
DetailsJim Page
Multiple fire sprinkler heads are over-spaced, coverage needs to be adjusted for correct spacing.
INSP-Sprinkler Rough-in1/5/20181/8/20181/8/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.