Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00654
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 800 W DIAMOND ST
Project NameAce Co. Addition
Customer Number 
ePlanReviewYes
Description
[AceCo Manufacturing]
The fire sprinkler scope of work consists of adding dry horizontal sidewalls to the HVAC areas.

Plan Mod 1/31/2018
Added another sidewall to the right hand building due to HVAC
[BLD17-02243]
This building is fire sprinklered for fire area. Permit is for two additions totaling 1,135 additional sq ft to enclose mechanical equipment and for modifications to the roof top mechanical units. Special inspections are required per Form 310. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **JAR**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/21/20182/21/20182/21/2018PPASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.
INSP-Sprinkler Rough-in2/14/20182/15/20182/15/2018PPASS
DetailsJim Page
Rough in inspection for area of work complete.