INSP-Final Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
John Phone #: ###-####
|
INSP-Final Inspection | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Troy Cobbley
|
|
|
Missing ceiling tile
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Payton Phone #: ###-####
|
INSP-Final Inspection | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final. Todays inspection was just for a rough-in. Hard lids are ok to cover. The remaining piping is not ok for cover. I noted three overspaced pendant heads in the large open area.
|