INSP-Final Inspection | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Contact Scott Powada ###-#### 30 min prior to fire final start for Inspectors Test System #1 please.
Thank YOU, Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | FAIL |
Troy Cobbley
|
|
|
This permit can be finaled when the flow switch for the sprinkler riser that serves this tenant space has been tested. It currently has no inspectors test for testing of the new flow switch
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed.
|