Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberFIR17-00689
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 1219 S BROADWAY AVE
Project NameALBERTSONS 199
Customer Number 
ePlanReviewYes
Description
[Albertsons 199]
The fire sprinkler scope of work consists of installing 6" C-900 piping from the hot tap (by Suez) into the riser room through a 6" Ames backflow and feed two wet systems in the 64,621 ft² new shopping center. All sprinklers will be quick response type. Loading area will use high temp heads. The cooler/freezer areas will use intermediate temp heads. There is a mezzanine on the east side of the building and an outdoor seating area which will use heat tracing. The systems are designed as a 4”x4”x1½” grids. A wall PIV will be provided.

• The underground piping is under permit FIR17-00627
(Note: The underground drawing is NOT approved at this time.)
[BLD17-01763]
Permit for the construction of a new 64,621 sq. ft. Albertsons Grocery Store with work to include general site with utilities and the construction of the new building Per the approved plans. This is a fully fire sprinklered building for area increase. Demolition of current building with construction of new store and related site work.

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are two AMM for this project at this time. Neither of the AMM affects the fire protection system.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/15/20186/15/20186/15/2018PPASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Final Inspection6/13/20186/14/20186/14/2018PCANC
DetailsJim Page
Inspection could no be performed due to fire alarm panel issues. Inspection request will need to be rescheduled, this request is cancelled.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro6/4/20186/4/20186/4/2018PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.

Richard Clark is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/30/20185/31/20185/31/2018ACANC
DetailsJim Page
Charles Lamb is the contact for this rough to cover -- hydro inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/29/20185/30/20185/30/2018PCANC
DetailsJim Page
Charles Lamb is the contact for this rough to cover -- hydro inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/29/20185/29/20185/29/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in the butcher area and the bakery area complete, approved for cover.
INSP-Sprinkler Rough-in5/29/20185/30/20185/29/2018PCANC
DetailsJim Page
Charles Lamb is the contact for this rough to cover and hydro inspection. Thank you for your help. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/25/20184/26/20184/26/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete, all hardlids approved for cover, fire sprinkler heads that will be installed in drop in tile ceiling will need to be inspected before cover is approved.
INSP-Sprinkler Rough-in/Hydro3/15/20183/21/20183/21/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler above hardlids on mezzanine level complete, notated city approved drawings with green highlighter/red ink area approved for cover.
INSP-Supply line flush3/15/20183/21/20183/21/2018PCANC
DetailsJim Page
Gabe Garduno is the contact for this flush. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush3/20/20183/21/20183/21/2018ADONE
DetailsJim Page
Underground main line flush complete.