INSP-Final Inspection | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Jessica Phone #: ###-####
|
INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PART |
Jim Page
|
|
|
Partial final inspection complete for fire sprinkler modifications in scope of work. Modifications have been made to the fire sprinkler system that was not done by Tribal Fire, demo work has also ben done by someone other than Tribal Fire.
|