INSP-Final Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Lee G Meredith
|
|
|
All systems tested 11/14/18. Issues with sync on that date were resolved by Steve Bingham PE performance testing that has since been approved on 1-25-19 by Ron Johnson.
|
DOC - Permit Finaled | | | 1/25/2019 | | PASS |
Lee G Meredith
|
|
|
|
INSP-Alarm Testing | 11/14/2018 | 11/14/2018 | 11/14/2018 | A | FAIL |
Lee G Meredith
|
|
|
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
On site 9:30 am with Nathan. Tested unit detectors and sounder for floors 2 - 5. Rooms requiring retest include 207,8,9,16, 315, 408, 503 and 506. Still to test is general alarm notification, corridor detection, manual alarm, all devices on 1st floor and garage, elevator recall and shunt, central station monitoring and batteries. Room on 1st floor is missing a pull box cover. Waterflow devices are missing covers.
On site 4:30 - 7:00 pm with Nathan and Adam Bayne. All remaining items tested and functioned. During general alarm, dwelling unit audible notificaiton did not sync with common area audible notificaiton. 11-15-18 discussed this issue with Ron Johnson.
|
INSP-Alarm Testing | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | FAIL |
Lee G Meredith
|
|
|
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
System not ready. Items tested were not consistently working properly.
|