INSP-Final Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | PASS |
Jim Page
|
|
|
Final inspection for underground supply and remote FDC complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2018 | 1/9/2018 | 1/9/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply and remote FDC witnessed, no observed pressure loss at riser gauge.
|
INSP-Sprinkler Rough-in | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | CANC |
Jim Page
|
|
|
Inspection request will be rescheduled for 9JAN2018, this request is cancelled.
|
INSP-Supply line flush | 12/21/2017 | 12/22/2017 | 12/22/2017 | A | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Supply line flush | 12/20/2017 | 12/21/2017 | 12/21/2017 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Brian Phone #: ###-####. To be rescheduled
|
INSP-Sprinkler Rough-in | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground, remote FDC and remote main drain complete, approved for cover.
|