INSP-Final Inspection | 3/30/2018 | 4/2/2018 | 4/2/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
after 10am please // Zach Phone #: ###-####
|
INSP-Final Inspection | 3/29/2018 | 3/30/2018 | 3/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
There were issues with the interconnection of the pressure switches and tamper switches. No actual testing was performed.
Zach Phone #: ###-####
|
INSP-Final Inspection | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | PART |
Troy Cobbley
|
|
|
The sync'ing of the notification has been repaired/tested and passed. All manual pull stations have been tested, the smoke detector above the main facp has been tested.
Zack Phone #: ###-####
|
INSP-Final Inspection | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | FAIL |
Jim Page
|
|
|
Flow switches on wet system fire sprinkler risers worked correctly. Audio visual notification did not sync correctly, audio visual devices will need to be re-inspected.
|
INSP-Final Inspection | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PART |
Troy Cobbley
|
|
|
For todays inspection I verifed the elevator recall smoke and heat detectors and the single duct smoke detector in the basement. The rest of the time I spoke to Steve, the project superintendant, about the possibility for a temporary.
Zak Anderson - Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was a walk through. I verified the head end equipment. I noted that plans need to be resubmitted for a plan modification due to 14 guage wire being used where as 12 guage was submitted. Also there are additional notification devices needed and many devices that need to be relocated or candella increased. The second floor wall layout at the east end does not match the plans. There is an access controled egress lock on the second floor that will need connected to the fire alarm system or contact will need to be made to the building code official. No devices have been tested.
John Howard - Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Conference | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | DONE |
Troy Cobbley
|
|
|
We dicussed strobe modifications in the first floor lobby and in the basement.
John Phone #: ###-####
|