Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR17-00734
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 6828 W MELROSE ST
Project NameSloanco
Customer Number 
ePlanReviewYes
Description
[Sloanco]
The fire sprinkler scope of work consists of steel Z purlin building with an office mezzanine. The system is design as a center feed tree with 4” main and 2” branch line. The 6” underground supplies a 4” backflow preventer and riser. Concealed space sprinklers are being used for below the mezzanine.

• The underground piping was installed under permit FIR17-00587

[BLD17-02932]
The fire sprinkler system will be used for building area increase, story increase, and for fire area. To construct a new 17,645 square foot building (14,659 square feet 1st story and 2,986 square feet 2nd story) to be used for office, fabrication, and storage. A grading permit (GRD17-00044) was issued earlier. A foundation permit (BLD17-03338) was also issued earlier and was for excavation, fill compaction, footings, and foundations for the building only. To erect a pre-engineered metal building with a wood framed 2 story office component below the roof of the metal building. The metal building work is to include steel columns, steel beams, steel purlins, metal siding, metal roof deck, and steel bracing. The wood framed office work is to include wood exterior bearing and nonbearing walls, stone veneer, 3-part stucco system, metal siding, wood interior bearing and nonbearing walls, wood floor trusses, wood floor sheathing, wood shear walls, an interior stairway, an exterior steel stairway, exterior doors, exterior windows, interior doors, interior windows, millwork, and finishes. Special Inspection is required for soils, concrete, welding, and bolting. Welding, painting, spraying, and coating operations done within this building as part of its use are required to be in compliance with the Fire Code. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. A separate permit is required for storage racks exceeding 8 feet in height. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro4/16/20184/17/20184/16/2018ACANC
DetailsJim Page
Hydro final- Dawn Phone #: ###-####
INSP-Final Inspection4/16/20184/16/20184/16/2018PPASS
DetailsJim Page
Final fire sprinkler inspection complete.
INSP-Sprinkler Rough-in/Hydro4/16/20184/16/20184/16/2018PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.
INSP-Sprinkler Rough-in4/16/20184/16/20184/16/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping complete.
INSP-Sprinkler Rough-in3/22/20183/23/20183/23/2018PPART
DetailsJim Page
Submit documentation supporting the point of attachment to Z-purlins for sway brace attachment. Submit documentation supporting the use of Sammy's being installed on the bottom of the Z-purlin instead of the side. Sway braces cannot be attached to each other, provide pipe clamps/quick clamps for each individual sway brace sprinkler main attachment.. Rough to cover inspection complete for office area levels 1 and 2, if bottom of purlin hanger attachment is not approved then hangers installed of purlin will need to be changed.
INSP-Sprinkler Rough-in2/8/20182/8/20182/8/2018PPART
DetailsTroy Cobbley
The sprinkler piping above the hard lids, as marked on the plans, is ok to cover. Plans however will need to be re-submitted due to pipe routing changes and pipe size changes. Also branchline restraints will possibly be needed as discussed where the 6" is exceeded for the hangers on the branchlines, also I need verification that nuts are not needed on the "side sammys" on the Z-pulins. Provide verification that the "Bottom Sammys" can be mounted on the bottom of the Z-purlins. If wood is going to be exposed at the top plate of the walls then upright sprinkler protection will be required.

Don Phone #: ###-####
INSP-Supply line flush2/8/20182/8/20182/8/2018PCANC
DetailsTroy Cobbley
Wrong permit number called in.

underground // Don Phone #: ###-####